New builds, from the first drawing to the final handover.
Complete new homes and buildings, planned carefully, built safely and managed with clear communication from groundworks to completion.
A whole new home, built as one coordinated project.
A new build brings together design, groundworks, structure, services and finishing. We manage the sequence so that each stage is ready for the next, and you always know what is happening on site.
Whether you are building a single home on your own plot or a larger building, we start by understanding what you want to achieve, then agree the scope and a programme before work begins.
- ScopeWhole new dwellings and buildings
- Best forPlot owners and self-builders
- CoverageUK-wide
- Starts withA conversation about your plot and your plans
Everything a new build needs, in the right order.
- Site set-up and preparation
- Excavation and foundations
- Drainage and underground services
- Structural walls, floors and roof
- Windows, doors and weatherproofing
- Coordination of mechanical and electrical services
- Internal fit-out and finishing
- Access, external works and final checks
From foundation to roof, stage by stage.
Scroll to watch the building rise. Each stage is planned so the next can start on solid ground.
Site set-up and foundations
Excavation, drainage runs and foundations set the base for everything above. We set out carefully and check as we go.
Ground floor structure
Walls and openings go up, with services routed before they are covered.
Upper floors
Upper floors and internal structure take shape, ready for the roof.
Roof and weatherproofing
The roof structure closes the building in, so internal work can continue whatever the weather.
Finishing and handover
Fit-out, finishing details and external completion, then a walk-through with you before handover.
A clear path from first call to handover.
Consultation
We talk through your plot, your plans and your goals.
Planning & design
Scope, drawings and sequence are agreed before work starts.
Quote
A clear price for the agreed scope of work.
Build & handover
Work managed on site, then a walk-through with you at handover.
Timings depend on the project
From an empty plot to a finished home.
We manage every stage of a new build, so you have one point of contact from groundworks to handover.
New build projects.
Placeholders · replace with real project photos
Drag to see the progress.
Our own new build progress photos will appear here.
Placeholder · replace with your own before and after photos (same viewpoint for both)
New build questions, answered.
Do I need planning permission for a new build?
A new dwelling normally needs planning permission and must meet Building Regulations. We’ll talk through what your project is likely to need at the start.
Can you work from my own drawings?
Yes. Send us your drawings and we’ll go through them with you. If you don’t have drawings yet, we can talk about the next steps.
How long does a new build take?
It depends on size, design, ground conditions and the weather. We agree a programme once the scope is clear and keep you informed if anything affects it.
How do I get a quote?
Send us your plans or a description of your plot by WhatsApp, phone or the contact page, and we’ll take it from there.
Planning a new build?
Tell us about your plot and your plans, and we’ll take it from there. We work across the whole of the UK.
